Homeowner’s guide
How to compare
builders’ quotes.
A quote is a price for the work it describes; an estimate is a rough guide to what the work might cost, and the final bill can change. Compare quotes line by line, by what each one covers, before you compare the totals.
Worked example
One room, two prices.
These fictional quotes illustrate how to read a scope. They aren’t prices for work in Swansea.
| Living room repaint | Quote A £280 | Quote B £360 |
|---|---|---|
| Materials | You buy the paint. | Wall and ceiling paint included. |
| Preparation | Walls only. Small holes filled. | Walls and ceiling. Filling and sanding included. |
| Timing | Monday start. Duration to confirm. | Thursday start. Two days expected. |
What would you ask?
Choose a detail to check. Keep the question with your own job.
Which materials are included, and what would I need to buy?
Open my briefWhat is the difference between a quote and an estimate?
A quote is a price for the work it describes. An estimate is a rough guide to what the work might cost, and the final bill can be higher or lower. If you are given an estimate, ask what could change the price, and ask for a quote once the work is clear. In Handled, each quote shows the price, what’s included and when the tradesperson can start, and the price is fixed, a range, or set out in stages.
Is a quote legally binding?
Once you accept a quote, it normally becomes part of your agreement with the tradesperson, so the price you accepted is the price for the work it describes. An estimate is not a fixed price, but the final bill should be reasonable. Under the Consumer Rights Act 2015, if no price was agreed you pay a reasonable price, and what a trader tells you about the work can form part of the contract if you relied on it when you agreed. If the work changes, the price can change too, so agree any extra in writing before it is done. This is general information, not legal advice: Citizens Advice can explain your rights if a price is in dispute.
What should a builder’s quote include?
Enough detail to see what you are paying for, and to compare it with another quote. Check that the quote covers:
- The work, described in the same terms as your brief
- Labour and materials, priced separately
- Whether the price includes VAT
- What is left out, such as skip hire, scaffolding or decorating afterwards
- Who supplies which materials and fittings
- For a bigger job, the stages: what each one covers and what it costs
- A start date and how long the work is expected to take
- How extra work will be priced and agreed
- Removing waste, clearing up and making good afterwards
- How long the quote is valid for
- The business’s name and address and, for a limited company, its registered name
- The insurance that covers the work, such as public liability insurance
Should a builder’s quote be itemised?
Yes, for anything beyond a small job. An itemised quote lists the tasks, labour, materials and other costs separately, so you can compare like with like and see what changes if the scope does. It should be detailed enough to check each line against your brief. If a quote is a single figure, ask for the breakdown before you accept it.
How many quotes should I get?
There is no fixed rule, but three is a common number to aim for, sometimes called the three-quote rule: enough to see how the scope and the price differ. Quotes are only comparable if they answer the same brief, so give every tradesperson the same description and photos. In Handled, you describe the job once and every quote answers that description.
How do I compare quotes line by line?
Put the quotes side by side and read each line before the totals. A gap in one quote is a question to ask, not a reason to choose another. Compare:
- The work each quote covers, against your brief
- Which materials are included, and who chooses them
- Preparation, clearing up and taking waste away
- The start date and how long the work will take
- Whether VAT is included
- How the price is paid: in one go, or in stages
- What each quote leaves out
What if one quote is much lower than the others?
Compare what each quote covers before you compare the totals. A lower figure can leave out preparation, materials or clearing up that another quote includes. Ask each tradesperson about the gaps, then compare again.
What should I ask before I accept a quote?
Read the scope against your original brief. Ask about anything that appears in one quote but is missing from another. If timing matters, agree both the start date and the expected duration. Questions worth asking:
- Is VAT included in the price?
- What isn’t included?
- Which materials are included, and what would I need to buy?
- What preparation, dust sheets and clearing up are included?
- When could you start, and how long would the work take?
- How is the price paid, and when is each payment due?
- How would any extra work be priced and agreed?
- How long is the quote valid for?
Can a builder charge more than the quote?
Not for the work the quote describes, unless your agreement says the price can change. If the job changes, or extra work is found once it has started, the price can change too: agree the extra and its price before it is done, and keep it in writing. In Handled, the tradesperson adds extra work as a separate item with a price. Nothing is added to the job until you approve it, and you pay for it the same way as the rest.
When is the tradesperson paid?
You pay in the app — the tradesperson is paid when you confirm the job's done. Bigger jobs, paid in stages — each one approved by you. In Handled you can keep your questions and the replies with the job. Read the payment details before you accept a quote.